| 
 Year  | 
 Activity  | 
| 
 1952  | 
 Anthrquinone dye manufacturing started; wastewater discharged to Toms River.  | 
| 
 1959  | 
 Azo dye and epoxy resin manufacturing started.  | 
| 
 1960  | 
 First wastewater treatment plant replaced; wastewater continues to be discharged to river.  | 
| 
 1966  | 
 Treated wastewater discharged to Atlantic Ocean through outfall pipeline.  | 
| 
 1977  | 
 Second wastewater treatment plant replaced  | 
| 
 1983  | 
 Site added to National Priorities List.  | 
| 
 1984  | 
 Pipeline break at Bay Avenue and Vaughn Avenue.  | 
| 
 1985  | 
 Pipeline break at Bay Avenue and Vaughn Avenue.
  Ciba-Geigy installed purge-well system to intercept and treat groundwater contamination.
  59 monitoring wells installed at CGC site    | 
| 
 1986  | 
 Pipeline break at Oak Ridge Parkway.
  Treatment of wastewater with PACT
  | 
| 
 1987  | 
 USEPA residential well sampling begins (58 wells)  | 
| 
 1988  | 
 ATSDR Public Health Assessment and two Health Consultations published
  Operable Unit I (groundwater) Remedial Investigation published
  Coulter Street and Whitesville Road well sampling
  
Pipeline break Bay Avenue and Hooper Avenue
  Dye manufacturing ceased.
  Ground water baseline risk assessment (11 indicator chemicals) published  | 
| 
 1989  | 
 Pipeline break at Mapletree Avenue and Old Freehold Road
  USEPA issues Record of Decision for Operable Unit 1 (groundwater)
  Occupational epidemiology study published  | 
| 
 1991  | 
 Wastewater discharge to Atlantic Ocean terminated
  ATSDR Health Assessment Addenda published - marsh sediments and surface waters; soil TIC's
  Epoxy resin manufacturing ceased.  | 
| 
 | 
| 
 1992  | 
 ATSDR Lead Initiative Summary Report published
  ATSDR Heath Consultation published - soil gases  | 
| 
 1993  | 
 Revised Draft Source Area Remedial Investigation and Baseline Risk Assessment published
  Cardinal Drive soil gas study
  USEPA issues Explanation of Significant Differences  | 
| 
 1994  | 
 On-site soil TIC investigation  | 
| 
 1995  | 
 NJDHSS childhood cancer incidence analysis for Dover Township,  1979-1991  | 
| 
 1996  | 
 On-site groundwater treatment system operational.
  NJDHSS and ATSDR issue Public Health Response Plan
  NJDHSS sampling of community water supply and exposure investigation begins
  On-Site groundwater monitoring (SAMP 4)  | 
| 
 1997  | 
 NJDHSS sampling of on- and off-site monitoring wells
  NJDHSS releases Public Health Consultation on childhood cancer incidence, 1979-1995
  Design of NJDHSS epidemiologic study of childhood cancer in Dover Township initiated  | 
| 
 1998  | 
 Long Term Monitoring Plan implemented  | 
| 
 1999  | 
 Feasibility study issued for Operable Unit 2 (on-site source areas)  |