Year |
Activity |
1952 |
Anthrquinone dye manufacturing started; wastewater discharged to Toms River. |
1959 |
Azo dye and epoxy resin manufacturing started. |
1960 |
First wastewater treatment plant replaced; wastewater continues to be discharged to river. |
1966 |
Treated wastewater discharged to Atlantic Ocean through outfall pipeline. |
1977 |
Second wastewater treatment plant replaced |
1983 |
Site added to National Priorities List. |
1984 |
Pipeline break at Bay Avenue and Vaughn Avenue. |
1985 |
Pipeline break at Bay Avenue and Vaughn Avenue.
Ciba-Geigy installed purge-well system to intercept and treat groundwater contamination.
59 monitoring wells installed at CGC site |
1986 |
Pipeline break at Oak Ridge Parkway.
Treatment of wastewater with PACT
|
1987 |
USEPA residential well sampling begins (58 wells) |
1988 |
ATSDR Public Health Assessment and two Health Consultations published
Operable Unit I (groundwater) Remedial Investigation published
Coulter Street and Whitesville Road well sampling
Pipeline break Bay Avenue and Hooper Avenue
Dye manufacturing ceased.
Ground water baseline risk assessment (11 indicator chemicals) published |
1989 |
Pipeline break at Mapletree Avenue and Old Freehold Road
USEPA issues Record of Decision for Operable Unit 1 (groundwater)
Occupational epidemiology study published |
1991 |
Wastewater discharge to Atlantic Ocean terminated
ATSDR Health Assessment Addenda published - marsh sediments and surface waters; soil TIC's
Epoxy resin manufacturing ceased. |
|
1992 |
ATSDR Lead Initiative Summary Report published
ATSDR Heath Consultation published - soil gases |
1993 |
Revised Draft Source Area Remedial Investigation and Baseline Risk Assessment published
Cardinal Drive soil gas study
USEPA issues Explanation of Significant Differences |
1994 |
On-site soil TIC investigation |
1995 |
NJDHSS childhood cancer incidence analysis for Dover Township, 1979-1991 |
1996 |
On-site groundwater treatment system operational.
NJDHSS and ATSDR issue Public Health Response Plan
NJDHSS sampling of community water supply and exposure investigation begins
On-Site groundwater monitoring (SAMP 4) |
1997 |
NJDHSS sampling of on- and off-site monitoring wells
NJDHSS releases Public Health Consultation on childhood cancer incidence, 1979-1995
Design of NJDHSS epidemiologic study of childhood cancer in Dover Township initiated |
1998 |
Long Term Monitoring Plan implemented |
1999 |
Feasibility study issued for Operable Unit 2 (on-site source areas) |