Order amid Chaos


Bomarc Site Work Plan

TABLE OF CONTENTS

LIST OF ACRONYMS 4

1.0 PURPOSE 9

1.1 Background 9
1.2 Project Organization and Key Personnel 11
1.2.1 Project Manager 11
1.2.2 Construction Manager 13
1.2.3 Site Certified Health Physicist 13
1.2.4 Site Sample Coordinator 13
1.2.5 Hazardous Material Broker 14
1.2.6 Site Quality Assurance Officer 14
1.2.7 Home Office Support 15
1.2.8 Subcontractors 15

2.0 REFERENCES 15

3.0 SITE CONSTRUCTION ACTIVITIES 16

3.1 Construction Mobilization and Training 16
3.2 Site Layout and Temporary Facilities 16
3.2.1 Site Access and Security 16
3.2.2 Utilities and Connection Points 17
3.2.3 Support Zone 17
3.2.4 Contamination Reduction Zone 17
3.2.5 Exclusion Zone 18
3.3 Site Preparation 18
3.3.1 Initial Radiological Survey 18
3.3.2 Land Surveying 18 3.3.3 Environmental Control Systems and Monitoring Program 19
3.3.4 Decontamination Pad 21
3.3.5 Excavation Soil Stockpile Areas 21
3.3.6 Shelter Debris Stockpile Areas 22
3.3.7 Transportation Container Load-out Area 22
3.4 Site Remediation Operations 23
3.4.1 Radiological Surveys and Laboratory Analysis 23
3.4.2 Personnel Surveying 24
3.4.3. Shelter 204 Dismantlement 24
3.4.4 Soil Remediation 26
3.4.5 Existing Waste Disposal 35
3.4.6 Load-Out and Transport to Rail Facility 37
3.4.7 Manifesting, Transportation, and Disposal 38
3.4.8 Quality Control and Oversight 39
3.4.9 Final Status Survey Sampling and Analysis 40
3.5 Back Filling and Site Restoration 40
3.6 On-Site Laboratory and Radiation Control Operations 41
3.7 Supporting Operations 41
3.7.1 Health and Safety, and Radiation Protection 41
3.7.2 Quality Control 43 3.7.3 Decontamination and Release Operations 44
3.7.4 Personnel, Equipment, and Facilities Demobilization 46
3.8 Project Reporting 46
3.8.1 Daily Reports 46
3.8.2 Monthly Reports 46
3.9 Final Report 47

APPENDIX A - SITE HEALTH AND SAFETY PLAN (HASP) 49
APPENDIX B - RADIATION PROTECTION PLAN 50
APPENDIX C - SAMPLING AND ANALYSIS PLAN 51
APPENDIX D - WASTE MANAGEMENT, TRANSPORTATION
AND DISPOSAL PLAN 52
APPENDIX E - PROJECT SCHEUDLE 53
APPENDIX F - DRAWINGS 54
APPENDIX G - REPORTS/FORMS 55
BACKBACK || CONTENTS || NEXTNEXT